METODE KERJA PENGGANTIAN JEMBATAN JALAN KERETA API ANTARA PADANG-TABING-DUKU LINTAS TELUK BAYUR-SAWAHLUNTO
Abstract
Full Text:
PDFReferences
AASHTO, 2007, LRFD, Bridge Design Specifications.
Departemen Pekerjaan Umum Direktorat Jendral Bina Marga dan Direktorat Bina Jalan Kota, 1997, Manual Kapasitas Jalan Indonesia (MKJI).
Departemen Pekerjaan Umum, 2002, SNI-03-2847-2002.
Departemen Pekerjaan Umum, 2004, SNI-T-12-2004.
Departemen Pekerjaan Umum, 2005, RSNI T-02-2005.
Departemen Pekerjaan Umum, 2008, SNI-03-2833-2008.
Departemen Pekerjaan Umum, 1987, SKBI-2.3.26.1987.
Parinduri, L., & Sulaiman, O. K. (2018, April). Biomass analysis at palm oil factory as an electric power plant. In Journal of Physics: Conference Series (Vol. 1007, No. 1, p. 012053). IOP Publishing.
Hasibuan, A., Arfah, M., Parinduri, L., Hernawati, T., Harahap, B., Sibuea, S. R., & Sulaiman, O. K. (2018, April). Performance analysis of Supply Chain Management with Supply Chain Operation reference model. In Journal of Physics: Conference Series (Vol. 1007, No. 1, p. 012029). IOP Publishing.
DOI: https://doi.org/10.30743/but.v13i3.543
Refbacks
- There are currently no refbacks.
Copyright (c) 2018 Bangun Pasaribu, Jupriah Sarifah, Darlina Tanjung
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Buletin Utama Teknik
Fakultas Teknik - Universitas Islam Sumatera Utara
Jl. Sisingamangaraja, Teladan, Medan 20217
Website: https://jurnal.uisu.ac.id/index.php/but
Email: bultek@ft.uisu.ac.id
Buletin Utama Teknik is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License