| |
| Issue |
Title |
| |
| Vol 21, No 2 (2026): Edisi Januari |
ANALISIS SISTEM PELUMASAN PADA MESIN MOBIL CANTER EURO 4 |
Abstract
PDF
|
|
Muhammad Yazid Fahri, Junaidi Junaidi, Muhammad Arifin |
| |
| Vol 20, No 1 (2024): Edisi September |
PENERAPAN METODE JUST IN TIME UNTUK EFISIENSI BIAYA PERSEDIAAN BAHAN BAKU KACANG KEDELAI DI UMKM TAHU BAPAK MALIK DI DESA WISATA KAMPUNG TAHU DOLOK MASIHUL |
Abstract
PDF
|
|
Ariyani Lubis, Tri Hernawati, Mahrani Arfah |
| |
| Vol 19, No 2 (2024): Edisi Januari |
EFISIENSI PENGGUNAN PILE SLAB DIBANDING METODE PENIMBUNAN TANAH TERHADAP BIAYA DAN WAKTU (STUDI KASUS: JALAN TOL TEBING TINGGI – PARAPAT (TAHAP 1) RUAS TEBING TINGGI – SERBELAWAN STA: 8+075 – 8+525) |
Abstract
PDF
|
|
Alvajar Nofanolo Harefa, Darlina Tanjung |
| |
| Vol 18, No 3 (2023): Edisi Mei |
PENGUJIAN TURBIN ANGIN DARRIEUS DI PANTAI MATEMATIK DELI SERDANG DENGAN VARIASI JUMLAH BLADE |
Abstract
PDF
|
|
Muslih Nasution, M. Rafiq Yanhar, Rusdian Tri Putra |
| |
| Vol 18, No 1 (2022): Edisi September |
ANALISIS NILAI EFEKTIVITAS MESIN INJECTION MOULDING DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PT. NAMASINDO PLAS MEDAN |
Abstract
PDF
|
|
Martua Raja Rangkuti, Suliawati Suliawati, Mahrani Arfah |
| |
| Vol 18, No 1 (2022): Edisi September |
ANALISA LINE BALANCING UNTUK MENINGKATKAN PRODUKSI REMPEYEK |
Abstract
PDF
|
|
Sakiman Sakiman, Mahrani Arfah, Suliawati Suliawati |
| |
| Vol 17, No 3 (2022): Edisi Mei |
APLIKASI BOILER SEBAGAI PEMBANGKIT UAP DALAM MENENTUKAN EFISIENSI |
Abstract
PDF
|
|
Muslih Nasution, Suhardi Napid |
| |
| Vol 21, No 1 (2025): Edisi September |
ANALISA MOBIL AVANZA VELOZ DITINJAU DARI ASPEK RISET PENELITIAN BERBASIS TEKNOLOGI |
Abstract
PDF
|
|
Bernadet Deriman Hati Ndruru, Junaidi Junaidi |
| |
| Vol 21, No 3 (2026): Edisi Mei |
ANALISIS DAN USULAN PERBAIKAN PROSES DISTRIBUSI BAJA RINGAN MENGGUNAKAN PENDEKATAN LEAN SYSTEM UNTUK MENINGKATKAN EFISIENSI OPERASIONAL DI PT. TRI MUSTIKA SEJAGAT |
Abstract
PDF
|
|
Adelia Putri Nasution, Abdurrozzaq Hasibuan, Wirda Novarika AK, Budhi Santri Kusuma |
| |
| Vol 21, No 3 (2026): Edisi Mei |
ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI PEKERJAAN PEMBANGUNAN GEDUNG TERMINAL BALIGE KAB. TOBA SUMATERA UTARA MENGGUNAKAN METODE CRASHING |
Abstract
PDF
|
|
Friska Monika Sinaga, Ahmad Bima Nusa, Husni Malik Hasibuan |
| |
| Vol 20, No 3 (2025): Edisi Mei |
PENGEMBANGAN PENGGUNAAN MOTOR INDUKSI PADA KENDARAAN LISTRIK HYBRID BERBASIS OPTIMALISASI PENYERAPAN ENERGI SURYA |
Abstract
PDF
|
|
Zulkarnain Lubis |
| |
| 1 - 11 of 11 Items |
|