|
Issue |
Title |
|
Vol 19, No 1 (2023): Edisi September |
EVALUASI RENCANA ANGGARAN BIAYA (RAB) DAN PROSES TENDER PROYEK REHABILITASI GEDUNG SEKOLAH POLISI NEGARA POLDA SUMUT |
Abstract
PDF
|
Bayu Setiawan Dahlan, Yusrizal Lubis |
|
Vol 20, No 1 (2024): Edisi September |
ANALISIS PERCEPATAN WAKTU DENGAN METODE FAST-TRACK PADA PELAKSANAAN PEMBANGUNAN IRIAN SUPERMARKET SETIABUDI OLEH PT. MITRA MANDIRI ASETINDO |
Abstract
PDF
|
Kriston Darwin Sidabutar, Yusrizal Lubis |
|
Vol 17, No 2 (2022): Edisi Januari |
ANALISIS TINGKAT PELAKSANAAN SISTEM MANAJEMEN KESELAMATAN KESEHATAN KERJA (SMK3) DAN PERSEPSI MASYARAKAT PADA PROYEK PEMBANGUNAN GEDUNG KANTOR KEJAKSAAN ACEH TENGAH |
Abstract
PDF
|
Diana Novita Sukma, Harmes Harmes, Ade Nurdin |
|
Vol 17, No 2 (2022): Edisi Januari |
EFISIENSI ALAT BERAT PADA BORROW MATERIAL PADA JALAN TOL MEDAN-BINJAI SEKSI 1 |
Abstract
PDF
|
Darlina Tanjung, Hamidun Batubara, Jupriah Sarifah, Angga Pratama Pasaribu |
|
1 - 4 of 4 Items |
|