| Issue | Title | |
| Vol 13, No 2 (2018): Edisi Januari | PERANCANGAN KOLEKTOR SURYA PEMANAS AIR UNTUK KEBUTUHAN RUMAH TANGGA DENGAN KAPASITAS 600 L/JAM | Abstract PDF |
| Muslih Nasution | ||
| Vol 16, No 3 (2021): Edisi Mei | PERANCANGAN SISTEM PAKAR MENDIAGNOSA PENYAKIT COVID-19 DENGAN METODE BACKWARD CHAINING BERBASIS ONLINE | Abstract PDF |
| Muhammad Ruswin Nasution, Khairuddin Nasution, Mhd. Zulfansyuri Siambaton | ||
| Vol 20, No 2 (2025): Edisi Januari | PERANCANGAN STRATEGI COFFEE SHOP DALAM PERSAINGAN BISNIS DENGAN PENDEKATAN BLUE OCEAN STRATEGY (STUDI KASUS : UD. PARKIRAN KOPI SEPEDA) | Abstract PDF |
| Erin Rizaldi Purba, Bonar Harahap, Tri Hernawati | ||
| Vol 21, No 1 (2025): Edisi September | PERAWATAN SISTEM PGMFI (PROGRAMED FUEL INJECTION) SEPEDA MOTOR HONDA CBR150R (CITY BIKE RACING) DENGAN MENERAPKAN PERAWATAN PREVENTIVE MAINTENANCE | Abstract PDF |
| Fadhil Ali Siahaan, Junaidi Junaidi, Din Aswan A Ritonga | ||
| Vol 13, No 3 (2018): Edisi Mei | PERBAIKAN ALAT PENGUTIP MINYAK DALAM SLUDGE DAN CONDENSAT | Abstract PDF |
| Yusmartato Yusmartato, Luthfi Parinduri | ||
| Vol 21, No 2 (2026): Edisi Januari | PERBAIKAN KUALITAS JERRYCAN 5 LITER DENGAN METODE SIX SIGMA DAN FMEA DI PT PERMATA HIJAU GROUP | Abstract PDF |
| Wirda Novarika AK, Suliawati Suliawati, Soritua Bill Clinton Tampubolon | ||
| Vol 13, No 1 (2017): Edisi September | PERBAIKAN METODE PENGELASAN SMAW (SHIELD METAL ARC WELDING) PADA INDUSTRI KECIL DI KOTA MEDAN | Abstract PDF |
| Ahmad Bakhori | ||
| Vol 15, No 3 (2020): Edisi Mei | PERBANDINGAN EFISIENSI SALURAN TRANSMISI JARAK PENDEK DAN MENENGAH UNTUK SIRKIT GANDA | Abstract PDF |
| Riza Pranata, Yusmartato Yusmartato, Ramayulis Nasution, Armansyah Armansyah | ||
| Vol 14, No 2 (2019): Edisi Januari | PERBANDINGAN KEKUATAN LENTUR PADA BALOK BETON BERTULANG YANG DICOR SECARA BERLAPIS DENGAN MUTU BERBEDA | Abstract PDF |
| Gunawan Tarigan | ||
| Vol 19, No 1 (2023): Edisi September | PERBANDINGAN KUAT TEKAN BETON MENGGUNAKAN AGREGAT KASAR BATU BASALT PADA PERENDAMAN AIR SULFUR DAN AIR TAWAR | Abstract PDF |
| Jantino Panjaitan, Diana Suita Harahap | ||
| Vol 16, No 2 (2021): Edisi Januari | PERBANDINGAN METODE MONONOBE DAN METODE VAN BREEN UNTUK PENGUKURAN INTENSITAS CURAH HUJAN TERHADAP PENAMPANG SALURAN DRAINASE | Abstract PDF |
| Nadya Al Husna Purba, Anisah Lukman, Jupriah Sarifah | ||
| Vol 21, No 1 (2025): Edisi September | PERBANDINGAN PERFORMA SEPEDA MOTOR HONDA VARIO 160 FI MENGGUNAKAN WEIGHT ROLLER STANDARD SEBERAT 19 GRAM DAN WEIGHT ROLLER RACING SEBERAT 12 GRAM BESERTA PENGARUH PREVENTIVE MAINTENANCE PADA CONTINOUSLY VARIABLE TRANSMISSION | Abstract PDF |
| Oscar Fredriek Sembiring, Junaidi Junaidi, Muhammad Arifin | ||
| Vol 15, No 3 (2020): Edisi Mei | PERBEDAAN TINGKAT KEPUASAN KONSUMEN DENGAN MENGGUNAKAN METODE STATISTIK, RELIABILITAS DAN KORELASI DI INDOMARET DAN ALFAMIDI | Abstract PDF |
| Andika Saputra, Suliawati Suliawati, Abdurrozzaq Hasibuan | ||
| Vol 20, No 1 (2024): Edisi September | PERCEPATAN MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN JAM KERJA PADA REKONSTRUKSI JALAN HUTA III NAGORI DOLOK PAMONGAN SUMATRA UTARA | Abstract PDF |
| Putri Artha Gusti Siregar, Yusrizal Lubis | ||
| Vol 15, No 2 (2020): Edisi Januari | PERENCANAAN DESAIN PEKERJAAN PEMBANGUNAN PONTON UKURAN 8 METER X 16 METER TERMINAL PENUMPANG DERMAGA A DUMAI | Abstract PDF |
| Indah Sundari, Marwan Lubis, Anisah Lukman, Darlina Tanjun | ||
| Vol 15, No 3 (2020): Edisi Mei | PERENCANAAN KAPASITAS PRODUKSI TEH HITAM MENGGUNAKAN METODE ROUGH CUT CAPACITY PLANNING DI PT. PERKEBUNAN NUSANTARA IV UNIT KEBUN TOBASARI | Abstract PDF |
| Dicky Liliyen, Tri Hernawati, Bonar Harahap | ||
| Vol 17, No 3 (2022): Edisi Mei | PERENCANAAN KEBUTUHAN BAHAN BAKU PRODUK KUE BAWANG ABON MENGGUNAKAN METODE MRP (MATERIAL REQUIREMENT PLANNING) | Abstract PDF |
| Hani Melia Darmayanti, Tri Hernawati, Bonar Harahap | ||
| Vol 16, No 1 (2020): Edisi September | PERENCANAAN PENAMPANG SALURAN DRAINASE DI DESA TUMPATAN NIBUNG BATANG KUIS KAB. DELI SERDANG SUMATERA UTARA | Abstract PDF |
| Farhandi Agustama Maha, Rumilla Rumilla, Anisah Lukman | ||
| Vol 20, No 3 (2025): Edisi Mei | PERENCANAAN PERKERASAN KAKU TULANGAN WIREMESH (RIGID PAVEMENT) JALAN PERUMAHAN PROPERTI CIKARANG BEKASI JAWA BARAT | Abstract PDF |
| Darlina Tanjung, Jupriah Sarifah, Marwan Lubis, Heri Hidayat | ||
| Vol 14, No 1 (2018): Edisi September | PORTAL PUBLIKASI JURNAL KARYA ILMIAH PROGRAM STUDI SISTEM INFORMASI FTK UNIVERSITAS HARAPAN BERBASIS WEB DENGAN METODE FAST (FRAMEWORK FOR THE APPLICATION OF SYSTEMS THINKING) | Abstract PDF |
| Marina Elsera | ||
| Vol 18, No 3 (2023): Edisi Mei | POTENSI KERUGIAN EKONOMI AKIBAT KEHILANGAN MINYAK PADA LIMBAH CAIR DI UNIT SLUDGE SEPARATOR DI PTPN IV KEBUN ADOLINA PERBAUNGAN | Abstract PDF |
| Indri Stephani Manalu, Siti Rahmah Sibuea, Wirda Novarika | ||
| Vol 18, No 3 (2023): Edisi Mei | RANCANG BANGUN MESIN PERAJANG MODEL VERTIKAL DENGAN SPINNER PENCUCI UMBI – UMBIAN KAPASITAS 60 KG/JAM | Abstract PDF |
| Robin Yusuf Panjaitan, Junaidi Junaidi, Yulfitra Yulfitra | ||
| Vol 21, No 2 (2026): Edisi Januari | RANCANG BANGUN MESIN PIROLISIS PENGHASIL BAHAN BAKAR DARI SAMPAH PLASTIK | Abstract PDF |
| Brian Martheus Hia, Junaidi Junaidi | ||
| Vol 17, No 3 (2022): Edisi Mei | RANCANG BANGUN PEMANAS INDUKSI DENGAN MENGGUNAKAN NE555 SEBAGAI PEMBANGKIT FREKUENSI | Abstract PDF |
| Syafruddin HS., R. Harahap, Ali HR., Jhon MP. | ||
| Vol 17, No 1 (2021): Edisi September | RANCANGAN PERGESERAN REL KERETA API PADA PEMBANGUNAN JALAN KERETA API KM 3+000 – 3+550 (PAS 5) LINTAS TEBING TINGGI-SIANTAR SUMATERA UTARA | Abstract PDF |
| Hafizal Hafizal, Bangun Pasaribu, M. Husni Malik Hasibuan | ||
| 301 - 325 of 359 Items | << < 8 9 10 11 12 13 14 15 > >> | |





